Back Lanes 2025
A section of back lanes in Linsford Park will undergo road reconstruction to ensure the continued stability and safety of the lane.
Households along the the following roads will be affected by back lane construction:
- 48 Avenue, from 52 Street to 53 Street
- 53 Street, from 48 Avenue to 46 Avenue
Lanes will be excavated down to the base or sub-grade, restabilized, and re-surfaced. Gas lines may be affected during this work, and the City will work closely with APEX Utilities as needed.
During reconstruction, access to the back lane will be limited and/or unavailable, and there may be impacts to RV parking and waste collection. Impacted residents are encouraged to move any RVs ahead of construction, and watch for specific details and timelines from the contractor as the work begins and progresses.
Contact | 780-980-7107 / engineering@leduc.ca |
Construction Timeline | Spring - Fall 2025 |
Funding | City of Leduc |
Project Update
Date | Status |
Feedback
Have a question about this project? Please fill out our online contact form.